DaBears4Lyfe
1000 Posts Club!
Hey All,
Ordered a JB4 and wireless smart phone connection.
I will be doing a complete review of my experience with the JB4.
My Set Up:
Kia Stinger GT1
Denso Spark Plugs - Gapped to about .022
DIY - Intake (same as DYI that was listed here - 3.3TT - DIY intakes w/Heat shielding drop about 0.2sec off 0-60)
Everything else is stock.
I moved rather quickly on ordering this prior to getting new Spark Plugs and thanks to Sal @Kia Stinger, I ordered my plugs on Friday 8/3 and he shipped them to me Next Day Air to get them Saturday.
Swapped in the new plugs on Sunday. Which the job seemed worst than what it was. It honestly felt like 10-14 bolts a few clips and hoses. Took less than an hour.
Ordered the JB4, wireless connection, and the Fuel Wire on Wed 8/1 - Received it Monday 8/6. Here are some pics of the packaging:
Excited to get this started and should have the JB4 installed later tonight.
I have to still review the requirements for Map2 but I planned on starting on Map 1 for 1-2 weeks to be able to give some feed back on each Map.
Ordered a JB4 and wireless smart phone connection.
I will be doing a complete review of my experience with the JB4.
My Set Up:
Kia Stinger GT1
Denso Spark Plugs - Gapped to about .022
DIY - Intake (same as DYI that was listed here - 3.3TT - DIY intakes w/Heat shielding drop about 0.2sec off 0-60)
Everything else is stock.
I moved rather quickly on ordering this prior to getting new Spark Plugs and thanks to Sal @Kia Stinger, I ordered my plugs on Friday 8/3 and he shipped them to me Next Day Air to get them Saturday.
Swapped in the new plugs on Sunday. Which the job seemed worst than what it was. It honestly felt like 10-14 bolts a few clips and hoses. Took less than an hour.
Ordered the JB4, wireless connection, and the Fuel Wire on Wed 8/1 - Received it Monday 8/6. Here are some pics of the packaging:


Excited to get this started and should have the JB4 installed later tonight.
I have to still review the requirements for Map2 but I planned on starting on Map 1 for 1-2 weeks to be able to give some feed back on each Map.